2 posts shown.
Thanks
The issue is all sorted out
Sending love to everyone 😉
Hi there,
I've been working on a production status report
In column "A", the inspectors log the inspection date; in "B", they note the specific shift; and in column "C", they list the quantity of non-conforming products. I am struggling to create a formula that sums up the total number of defective units for a specific date during the first shift. It is possible for the same date to appear multiple times because several different inspectors might perform checks, each logging their own entries separately.
Thanks in advance!