#1 ·
Maybe this topic’s already been covered, but whatever...
hoping I can grab some insight here.
I'm trying to figure out what a standard commission looks like for a manager when they close a deal... specifically within a design studio setting.
1. Is it better to put them on payroll or just go with a contract basis?
2. If they're on the payroll, should we be looking at a fixed salary or a percentage?
3. What kind of percentage are we talking about?
4. And is that cut based on the total project value or just the portion they actually brought in?
Any help would be huge—I've got a feeling this guy might be trying to fleece me...
🙄
hoping I can grab some insight here.
I'm trying to figure out what a standard commission looks like for a manager when they close a deal... specifically within a design studio setting.
1. Is it better to put them on payroll or just go with a contract basis?
2. If they're on the payroll, should we be looking at a fixed salary or a percentage?
3. What kind of percentage are we talking about?
4. And is that cut based on the total project value or just the portion they actually brought in?
Any help would be huge—I've got a feeling this guy might be trying to fleece me...
🙄